Shanghai Petrochemical production line M800E; dimerization production F280S0; tripolymer production M180R.
Yangzi Petrochemical PP equipment A line production F401, B line production YPJ706, new line production K8003.
Dushanzi Petrochemical PP plant first-line production T30S, second-line production DY-ZK0640P. The resources were uniformly deployed in the Northwest Company, and the inventory was normal. Today's sales are sluggish.
Panjin Ethylene added 460,000 tons of ethylene cracker. After the completion of new production capacity, the total ethylene capacity of Panjin Ethylene will reach 620,000 tons, which is expected to be completed in early 2009. The downstream polymerization facilities will be 300,000 tons of HDPE and 250,000 tons of PP.
The Dalian organic PP new plant produced the T30S, and the 70,000-ton plant produced the T30S. The other 50,000-ton-old plant continued to be parked. There was no plan to drive the plant. Manufacturers in general, sales are sluggish.
Maoming Petrochemical PP first-line equipment produced EPS30R, second-line PP equipment conversion N-Z30S, factory inventory is normal, sales are generally.
A 140,000-ton/year polypropylene plant in Dongxing, Zhanjiang, will be built using one of the most advanced and major polypropylene production technologies at home and abroad – the domestic second-generation ring-loop process, with a polymerization line (liquid phase polymerization part). Double loop reactor), a granulation line and two packaging lines (woven bag stationary packaging machine, 1000 bags/hour). It is expected that it will be officially put into production in September 2009.
PetroChina Jinxi Petrochemical has built a new 150,000-ton polypropylene project, which is currently under construction. The company plans to start production in June. The device uses gas-phase polypropylene technology, ABB company as the Jinxi polypropylene project technology vendors.
The Lanzhou Petrochemical PP plant will be shut down on May 27, and it plans to drive on June 26th. The old plant will normally produce the F401. (The capacity of PP in the new plant is 300,000 tons/year, and the PP capacity of the old plant is 50,000 tons/year). The inventory is normal. Today's sales situation is normal.
Yanshan Petrochemical PP plant produced a polymer B4101; dimerized pipe material PPR4220; trimer conversion S1003.
PE latest device dynamics
Jilin Petrochemical LLDPE plant production 7042, HDPE plant production pipe material GC100S, and plans to schedule production to the end of July.
The Daqing Petrochemical old LDPE plant was parked, the new high-pressure production 2426H, LLDPE plant production 7042, low-voltage A/B line production 5000S, C line production 5300E.
Guangzhou Petrochemical LLDPE plant suddenly stopped due to a failure and is expected to stop production until the end of the month. It is reported that production can be resumed by the beginning of July.
Shanghai Petrochemical 1PE first-line production Q210, second-line production DJ200A, 2PE production Q281, low-voltage production of MH602.
Yangzi Petrochemical HDPE device A line produced 5000S, B line produced 5306J, C line produced 4803T, and LLDPE device produced 7042.
Maoming Petrochemical PE plant production conditions: 1# high pressure production 951-050, 2# high pressure conversion 2426H; full density production 7042; high density production TR144.
Yanshan Petrochemical PE new high-pressure converting LD605, the old high-pressure 1 line planned repair, 2 line production 1I2A, 3 line production 1C7A, low voltage 1 line production 5200B, 2 line production 2300XM.
PS latest device dynamics
The Chevron Phillips PS benzene conversion unit was shut down at the beginning of June for a period of approximately one month. It is reported that the installation will be reopened in early July and the current price is not quoted.
The Shanghai Secco PS device has been parked around May 16, and it is reported that the upstream device is scheduled to be overhauled on July 15. It is expected that the restart time of the PS device will be around mid-July.
The Acer Open (Shantou) PS has a stable ex-factory price and there are substantial space for actual shipments. The recent shipments have been poor. Low inventory, one line to produce benzene 118, one line to benzene 127, operating rate of 80%. It is reported that the factory will start the maintenance of the device on July 5-8 for a period of about 10 days.

NINGBO ZHONGWANG AUTO FITTINGS CO.,LTD has mainly engaged in Japanese Engine Parts and has provided Various kinds of automobile, 

Such as Enginer cylinder Liner Kits,  Pistion Ring, enginee Bushing, and so on.   Brand IZUMI,   We have been enjoying good reputation in the automobile parts

Industry for more then ten years.

IZUMI Liner, Pistion

IZUMI, Liner Pistion

Ningbo zhongwang auto fittings co.,ltd , https://www.zowoparts.com